Open |
Arkansas Measurement Rules |
Policy |
Division 2 - Arkansas River Basin: Measurement Rule Variance Policies - Cover Letter, Rule List |
2008-04-11 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2008-03.0A: Allowable Variance to Amended Measurement Rule 3 for Hour Meters |
2008-04-01 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2008-03.0B: Allowable Variance to Amended Measurement Rule 3 for Privately-Owned Electric Meters (Aka Slave Meter) |
2008-04-01 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2008-03.1A: Clarifications to Amended Measurement Rule 3.1: Totalizing Flow Meters |
2008-04-01 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2008-03.1C: Clarification and Variance to Amended Measurement Rule 3.1: Totalizing Flow Meter Testing Frequency |
2008-04-01 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2008-03.2A: Allowable Variance to Amended Measurement Rule 3.2: System Stabilization |
2008-04-01 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2008-03.2B: Allowable Variance to Amended Measurement Rule 3.2: PCC Re_Rating Frequency |
2008-04-01 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2010-3.1B: Clarification and Variance to Amended Measurement Rule 3.1: Totalizing Flow Meter Correction Factors (Field Calibration) |
2011-09-01 |
Open |
Arkansas Measurement Rules |
Policy |
Measurement Rule Policy 2011-3.1A: Allowable Variance for Coal Bed Methane Wells to Amended Measurement Rule 3.1: Totalizing Flow Meter Correction Factors (Field Calibration) |
2010-05-01 |
Open |
Arkansas Measurement Rules |
Standard |
Well Measurement Program Standard |
2019-10-01 |
Open |
Augmentation Plan |
Policy |
Policy 1995-1: Acceptance of 25-year Lease Augmentation Supplies |
1995-02-24 |
Open |
Augmentation Plan |
Protocol |
AUGMENTATION PLAN ACCOUNTING PROTOCOL |
2022-06-01 |
Open |
Augmentation Plan |
Written Instruction and Order |
Written Instruction 2020-1: Out of Priority Water Rights Absolute |
2020-07-21 |
Open |
Board of Examiners |
Bulletin |
Board Bulletin 2001-1: Clarification of "Advertisement" and License Number Display |
2001-08-07 |
Open |
Board of Examiners |
Bulletin |
Board Bulletin 2021-1: Poor Quality Water from Coal or Other Zones |
2021-05-03 |
Open |
Board of Examiners |
Bulletin |
BOE Bulletin 2022-A: Construction of Wells in the Dakota Group Aquifer |
2022-02-07 |
Open |
Board of Examiners |
Bulletin |
BOE Bulletin 2022-B: Construction of Wells in the Cheyenne Basin |
2022-02-07 |
Open |
Board of Examiners |
Bulletin |
Revoked Board Bulletin 2000-2: Poor Quality Water from Coal Zones |
2000-12-05 |
Open |
Board of Examiners |
Bulletin |
Revoked Board Bulletin 2004-1: Rule Making Advisory and Implementation of Well Inspection Program |
2004-02-18 |
Open |
Board of Examiners |
Guideline |
GPS Datum Change Notice from NAD27 to NAD83 |
2004-10-01 |
Open |
Board of Examiners |
Guideline |
Guideline 2016-1A BOE Staff Variance Authority |
2018-08-06 |
Open |
Board of Examiners |
Guideline |
Revoked Guidelines for Submittal of As-Built Well Locations Pursuant to Rule 6.2.3 of the Water Well Construction Rules |
2000-09-21 |
Open |
Board of Examiners |
Policy |
POLICY 2003-3: CONSTRUCTION STANDARDS FOR WELLS IN THE UNCONFINED SEDIMENTS OF THE ALAMOSA FORMATION IN THE SAN LUIS VALLEY |
2003-08-05 |
Open |
Board of Examiners |
Policy |
POLICY 2016-1: BOARD APPROVAL OF CHEMICALS USED IN WELL DEVELOPMENT AND REHABILITATION |
2016-11-07 |
Open |
Board of Examiners |
Policy |
POLICY 2017-2: WELLS CONSTRUCTED INTO TYPE I AQUIFERS (CONFINED) OVERLAIN BY A TYPE III AQUIFER (ALLUVIAL/COLLUVIAL) |
2017-05-01 |
Open |
Board of Examiners |
Policy |
POLICY 2017-3: WELLS CONSTRUCTED INTO TYPE II AQUIFERS WITHIN THE BOUNDARIES OF THE SOUTHERN HIGH PLAINS DESIGNATED BASIN |
2017-08-07 |
Open |
Board of Examiners |
Policy |
POLICY 2018-1: CONCERNING VARIANCE REQUESTS FOR THE CONSTRUCTION OF HORIZONTALLY/DIRECTIONALLY-DRILLED MONITORING HOLES, MONITORING WELLS, AND TEST HOLES |
2018-11-05 |
Open |
Board of Examiners |
Policy |
POLICY 2018-2: CLARIFICATION OF RULE 16.2, GROUTING REQUIREMENT FOR TYPE I AQUIFER WELL ABANDONMENT |
2018-11-05 |
Open |
Board of Examiners |
Policy |
POLICY 2019-1: IMPLEMENTATION OF HOUSE BILL 18-1198, CONCERNING THE ESTABLISHMENT OF BEST PRACTICES FOR STATE BOARDS AND COMMISSIONS |
2019-02-04 |
Open |
Board of Examiners |
Policy |
POLICY 2019-2 INVESTIGATION OF VIOLATIONS AND NEGOTIATION OF STIPULATED SETTLEMENTS |
2024-05-23 |
Open |
Board of Examiners |
Policy |
POLICY 2019-3: DELIBERATE OBSTRUCTION OF THE WELL INSPECTION PROCESS |
2019-11-04 |
Open |
Board of Examiners |
Policy |
POLICY 2020-1: DEFINING HIGH RISK WELLS AND KEY PHASES OF WELL CONSTRUCTION |
2020-02-03 |
Open |
Board of Examiners |
Policy |
POLICY 2020-2: ADVANCE NOTICE OF WELL CONSTRUCTION, PUMP INSTALLATION, CISTERN INSTALLATION, AND WELL ABANDONMENT |
2020-02-03 |
Open |
Board of Examiners |
Policy |
POLICY 2020-3: SHORT-TERM DISCHARGES TO GROUNDWATER FROM WATER WELL ACTIVITIES |
2020-02-03 |
Open |
Board of Examiners |
Policy |
POLICY 2021-1: CONTINUING EDUCATION OBTAINED BY INTERNET OR ONLINE PARTICIPATION |
2021-02-01 |
Open |
Board of Examiners |
Policy |
POLICY 2021-2: WELLS CONSTRUCTED IN THE ALLUVIAL, OGALLALA, AND WHITE RIVER AQUIFERS INSIDE THE NORTHERN HIGH PLAINS DESIGNATED BASIN |
2021-05-03 |
Open |
Board of Examiners |
Policy |
POLICY 2021-3: CONTINUING EDUCATION OBTAINED BY INTERNET OR ONLINE PARTICIPATION FOR 2022 |
2021-10-29 |
Open |
Board of Examiners |
Policy |
POLICY 2022-1: CONTINUING EDUCATION OBTAINED BY INTERNET OR ONLINE PARTICIPATION FOR 2023 |
2022-11-14 |
Open |
Board of Examiners |
Policy |
POLICY 2023-1: PORTLAND-LIMESTONE CEMENT (ASTM C-595, TYPE IL) AS REPLACEMENT FOR PORTLAND CEMENT (ASTM C-150) |
2023-09-26 |
Open |
Board of Examiners |
Policy |
POLICY 2023-2: CONTINUING EDUCATION OBTAINED BY INTERNET OR ONLINE PARTICIPATION FOR 2024 |
2023-11-06 |
Open |
Board of Examiners |
Policy |
POLICY 2024-1: CONCERNING THE PLACEMENT OF FILTER PACK ABOVE OR BELOW THE PERMITTED PRODUCTION ZONE IN TYPE 1 WELLS (EXCLUDING THE CONFINED SAN LUIS VALLEY AQUIFER) |
2024-10-01 |
Open |
Board of Examiners |
Policy |
POLICY 2024-2: CONTINUING EDUCATION OBTAINED BY INTERNET OR ONLINE PARTICIPATION FOR 2025 |
2024-12-03 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1972-1: AUTOMATIC SUSPENSION FOR TWO SERIOUS VIOLATIONS |
2000-06-06 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1974-1: MUNICIPAL WELL INSPECTION |
2000-06-06 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1990-1: EXEMPTIONS FOR GRAVEL PIT WELLS |
2002-10-01 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1991-1: NEW WORK REPORT FORMS |
2000-06-06 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1991-2: EXPIRATION OF VERBAL APPROVALS |
2000-06-06 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1991-3: STAFF APPROVAL OF VARIANCE TO THREE DAY NOTICE REQUIREMENT |
2000-06-06 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1991-4: USE OF FLY ASH ADDITIVE IN CEMENT GROUTS |
2000-10-03 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 1999-1: WRITTEN EXAM ON WATER WELL CONSTRUCTION RULES STATUTES |
2009-10-06 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2000-1: ISSUANCE OF PUMP INSTALLATION LICENSES TO REFLECT CHANGE IN NGWA EXAMINATION |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2000-2: RE-USE OF LICENSE NUMBERS |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2000-3: LICENSE REQUIREMENTS FOR THE CONSTRUCTION OF GALLERY-TYPE WELLS AND SPRING WELLS |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2000-4: EXCEPTION FOR GRAVEL PIT WELLS |
2014-07-01 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2000-5: USE OF FLY ASH ADDITIVE IN CEMENT GROUNDS |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2001-1: EDUCATION AND TRAINING AS DRILLING AND/OR PUMP INSTALLATION EXPERIENCE |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2001-2: RENEWAL OF PUMP INSTALLATION LICENSES TO REFLECT PUMP CATEGORIES BASED ON PRODUCTION RATE |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2002-1: PUMP INSTALLATION IN CISTERNS - NO LICENSE REQUIRED |
2004-10-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2003-1: WRITTEN EXAMINATION OF THE STATUTES AND WATER WELL CONSTRUCTION RULES |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2003-2: DELEGATION OF AUTHORITY TO STATE ENGINEER FOR EXEMPTION TO CONTINUOUS ON-THE-SITE SUPERVISION |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2004-1: CONTINUING EDUCATION COORDINATION WITH CWWCA AND GENERAL IMPLEMENTATION |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2004-2: DISCIPLINARY ACTION, FINE SCHEDULE AND DELEGATION OF AUTHORITY, STIPULATED SETTLEMENTS |
2008-10-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2004-2A: DISCIPLINARY ACTION, FINE SCHEDULE AND DELEGATION OF AUTHORITY, STIPULATED SETTLEMENTS |
2019-08-02 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2005-1: LIMIT FOR CONTINUING EDUCATION CREDIT FROM INTERNET, ON-LINE OR CORRESPONDENCE COURSES AND SAFETY RELATED COURSES |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2005-1A: LIMIT FOR CONTINUING EDUCATION CREDIT FROM INTERNET, ON-LINE OR CORRESPONDENCE COURSES AND SAFETY RELATED COURSES |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2007-1: ANNUAL CONTINUING EDUCATION REQUIREMENT |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2007-2: CONTINUING EDUCATION CREDIT FOR PRESENTATIONS |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2008-1: NO CONTINUING EDUCATION ACCREDITATION FOR POST-ATTENDANCE REQUESTS |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2009-1: APPLICATION OF CONTINUING EDUCATION CREDITS EARNED BEFORE LICENSING |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2012-1: CLARIFICATION OF RULE 10 REGARDING PROPER SEALING AND GRAVEL PACKING OF WELLS |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2012-2: THE USE OF NON-SHRINKING CEMENTITIOUS GROUTS FOR GROUTING WATER WELLS |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2014-1: EXCEPTION FOR GRAVEL PIT WELLS & POND WELLS |
2016-11-07 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2015-1: CONTRACTUAL RELATIONSHIPS BETWEEN LICENSED CONTRACTORS AND UNLICENSED INDIVIDUALS |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2017-1: PERSONS AUTHORIZED TO COMPLETE AND SIGN POST-CONSTRUCTION WELL INSPECTION REPORTS (GWS-68) |
2018-02-05 |
Open |
Board of Examiners |
Policy |
REVOKED POLICY 2019-2 (AMENDED MAY 2021): INVESTIGATION OF VIOLATIONS AND NEGOTIATION OF STIPULATED SETTLEMENTS |
2021-05-03 |
Open |
Dam Safety |
Guideline |
Guidelines for Conduit Installation and Breaching at Low Hazard Dams |
2021-01-08 |
Open |
Dam Safety |
Guideline |
Guidelines for Dam Breach Analysis |
2020-01-21 |
Open |
Dam Safety |
Guideline |
Guidelines for Dam Breach Analysis: Spreadsheet for Estimating Dam Breach Parameters Using the Froehlich Method |
2010-02-10 |
Open |
Dam Safety |
Guideline |
Guidelines for Dam Breach Analysis: Spreadsheet for Estimating Dam Breach Parameters Using the MacDonald Langridge-Monopolis/Washington State Method |
2010-02-10 |
Open |
Dam Safety |
Guideline |
Guidelines for Design Review |
2023-03-06 |
Open |
Dam Safety |
Guideline |
Guidelines for Early Warning System Programs |
2020-05-27 |
Open |
Dam Safety |
Guideline |
Guidelines for Hazard Classification |
2020-01-21 |
Open |
Dam Safety |
Guideline |
Guidelines for Hydrologic Hazard Analysis |
2020-01-21 |
Open |
Dam Safety |
Guideline |
Guidelines for Hydrological Modeling and Flood Analysis |
2022-09-12 |
Open |
Dam Safety |
Guideline |
Guidelines for Preparation of Subsurface Investigation Plans |
2020-01-21 |
Open |
Dam Safety |
Guideline |
Guidelines for the use of Regional Extreme Precipitation Study (REPS) Rainfall Estimation Tools |
2024-08-22 |
Open |
Dam Safety |
Guideline |
Guidelines for use of Comprehensive Dam Safety Evaluation (CDSE) Risk Assessments & Risk Informed Decision Making (RIDM) |
2021-03-08 |
Open |
Dam Safety |
Guideline |
Guidelines for use of the Freeboard & Riprap Wind and Wave Analysis (FRWWA) Spreadsheet Design Tool |
2021-04-20 |
Open |
Denver Basin |
Policy |
Policy 1990-2 Combined Pumping of Tributary and Nontributary Ground Water from the Same Well in the Denver Basin |
1990-01-22 |
Open |
Denver Basin |
Policy |
Policy 1994-3 Applications for Permits to Construct Wells into Not Nontributary aquifers Prior to Court Approval of a Plan for Augmentation |
1994-05-12 |
Open |
Designated Basin |
Guideline |
2007-1 Guideline Concerning the Ground Water Commission Staff's Publication and Evaluation of Replacement Plans in the Designated Basins |
2007-05-31 |
Open |
Designated Basin |
Guideline |
2011-1 Guideline Concerning Designated Basins Enforcement Procedures |
2011-08-08 |
Open |
Designated Basin |
Guideline |
Guideline 2023-1 Concerning uses of water from exempt and small capacity wells |
2023-12-20 |
Open |
Designated Basin |
Policy |
Policy 1994-4 Small Capacity Commercial Wells for Confined Animal Feeding Operations Designated Ground Water Basins |
1994-10-13 |
Open |
Designated Basin |
Policy |
Policy 1995-3 Concerning Use of Flow Meters or Power Meters (as an Alternate Method or Device for Water Measurement) |
1998-04-08 |
Open |
Designated Basin |
Policy |
Policy 2018-1 Concerning the Implementation of House Bill 18-1198 |
2018-11-02 |
Open |
Gravel Pit |
Guideline |
Guideline 2019-1 Use of Pre-Existing Conditions to Offset Depletions from Onstream Reservoirs and Permitted Mining Operations |
2019-01-16 |
Open |
Gravel Pit |
Guideline |
Guidelines for Substitute Water Supply Plans for Sand and Gravel Pits |
2024-07-26 |
Open |
Gravel Pit |
Guideline |
State Engineer Guidelines for Lining Criteria for Gravel Pits |
1999-08-16 |
Open |
Graywater |
Administrative Statement |
Administrative Position for Graywater Reuse |
2011-09-07 |
Open |
Rainwater, Storm Water |
Administrative Statement |
Administrative Statement Regarding the Management of Storm Water Detention Facilities and Post-Wildland Fire Facilities in Colorado |
2016-02-11 |
Open |
Republican River Basin |
Guideline |
Guideline (Rule 16.5.A.3) - Interim Measurement Program for Inoperable Measurement Devices |
2013-04-15 |
Open |
Republican River Basin |
Policy |
RESCINDED: Policy Memorandum 2008-1 (Rescinded - April 15, 2018) |
2018-04-15 |
Open |
Rio Grande River Basin |
Policy |
Division 3 - Policy 2020-1: Concerning the Administration and Accounting of Non-Exempt, Flowing Artesian Wells in the Rio Grande Basin |
2020-11-06 |
Open |
Rio Grande River Basin |
Policy |
Policy 2003-3 (Modified November 8, 2016): Regarding Supplemental Wells, Alternate Points of Diversions for Wells and Replacement Wells, including Deepening of Wells in Water Division III |
2016-11-08 |
Open |
Rio Grande River Basin |
Policy |
Policy 2010-1: Regarding the Establishment of Irrigation Season Dates |
2010-04-14 |
Open |
South Platte River Basin |
Policy |
Policy 2015-01: South Platte Tributary Ground Water Measurement Rules |
2015-02-01 |
Open |
Subdivision |
Guideline |
Guideline 2016-1 Concerning Water Supplies for Auxiliary Living Spaces |
2023-12-20 |
Open |
Subdivision |
Guideline |
Guideline 2019-2: Late Subdivision Letter Process |
2019-05-16 |
Open |
Subdivision |
Guideline |
Subdivision Memo to All County Land Use Planning Directors regarding the State Engineer's Office review of subdivision water supply plans |
2005-03-16 |
Open |
Subdivision |
Policy |
Policy 1999-1: Location of Conditional Ground Water Rights (Water Wells) in a Proposed Subdivision within a Pending Plan for Augmentation |
1999-03-12 |
Open |
Subdivision |
Policy |
Policy 2011-1 Concerning the Evaluation of New Divisions of Land by Subdivision, Subdivision Exemption, and Cluster Development when Considering Proposals for Water Supply from Proposed Wells or Existing Wells |
2021-03-24 |
Open |
Substitute Water Supply Plan |
Guideline |
Guideline 2019-1 Use of Pre-Existing Conditions to Offset Depletions from Onstream Reservoirs and Permitted Mining Operations |
2019-01-16 |
Open |
Substitute Water Supply Plan |
Guideline |
Guidelines for Substitute Water Supply Plans for Sand and Gravel Pits |
2024-07-26 |
Open |
Substitute Water Supply Plan |
Policy |
Policy 2003-2 Implementation of Section 37-92-308, C.R.S. (2003) Regarding Substitute Water Supply Plans |
2003-08-12 |
Open |
Substitute Water Supply Plan |
Protocol |
AUGMENTATION PLAN ACCOUNTING PROTOCOL |
2022-06-01 |
Open |
Water Administration |
Guideline |
Division 1 - South Platte River Administrative Guideline: Access to Private Property |
2007-12-01 |
Open |
Water Administration |
Guideline |
Division 1 - South Platte River Administrative Guideline: Accounting Acquisition & Review |
2009-02-05 |
Open |
Water Administration |
Guideline |
Division 1 - South Platte River Administrative Guideline: Administration Number (aka Holt Number) |
2009-07-28 |
Open |
Water Administration |
Guideline |
Division 1 - South Platte River Administrative Guideline: Out of Priority Storage Under 37-80-120 CRS |
2006-07-27 |
Open |
Water Administration |
Guideline |
Division 1 - South Platte River Administrative Guideline: Purpose and Types of Documents |
2007-12-21 |
Open |
Water Administration |
Guideline |
Division 1 - South Platte River Administrative Guideline: Reservoir Accounting Guideline |
2018-11-14 |
Open |
Water Administration |
Guideline |
General Administration Guidelines for Reservoirs |
2016-02-01 |
Open |
Water Administration |
Guideline |
Guideline 2019-3 Reservoir Accounting |
2019-11-22 |
Open |
Water Administration |
Guideline |
GUIDELINE 2021-1 PROCEDURE FOR THE STATE ENGINEER TO CONFIRM THE EXTENT OF CLAIMED UNADJUDICATED USES OR EXCHANGES OF WATER BEING MADE ON THE DATE OF APPROPRIATION OF AN INSTREAM FLOW WATER RIGHT |
2021-09-15 |
Open |
Water Administration |
Policy |
Division 3 - Policy 2020-1: Concerning the Administration and Accounting of Non-Exempt, Flowing Artesian Wells in the Rio Grande Basin |
2020-11-06 |
Open |
Water Administration |
Protocol |
AUGMENTATION PLAN ACCOUNTING PROTOCOL |
2022-06-01 |
Open |
Water Administration |
Protocol |
Division 1 - REVOKED South Platte River Administrative Protocol: Administration Protocol Dry-Up of Irrigated Land |
2022-12-01 |
Open |
Water Administration |
Protocol |
Division 1 - REVOKED South Platte River Administrative Protocol: Augmentation Plan Accounting |
2022-06-01 |
Open |
Water Administration |
Protocol |
Division 1 - REVOKED South Platte River Administrative Protocol: Augmentation Plan Exchanges |
2020-10-01 |
Open |
Water Administration |
Protocol |
Division 1 - REVOKED South Platte River Administrative Protocol: Recharge |
2020-10-01 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Alternate Point of Diversion Wells |
2007-12-27 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Augmentation Station Criteria |
2011-05-12 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Data Logger Criteria |
2010-04-26 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Delivering Water Using the Natural Stream |
2008-01-31 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Diverting Tributary Water & Calling for Water |
2018-11-28 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Recharge |
2022-05-02 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Temporary Detention of Direct Flow Rights |
2008-07-01 |
Open |
Water Administration |
Protocol |
Division 1 - South Platte River Administrative Protocol: Use Of Replacement Sources Not Specifically Identified In An SWSP or Augmentation Plan |
2009-03-23 |
Open |
Water Administration |
Standard |
Administrative Call Standard |
2018-04-01 |
Open |
Water Administration |
Standard |
Diversion Records Standard |
2018-11-01 |
Open |
Water Administration |
Standard |
Division 2 - Functional Standards - Headgate - Water and Irrigation Water Rights and Irrigation |
2019-06-07 |
Open |
Water Administration |
Standard |
Division 6 - Functional Standards for Measuring Devices |
2024-08-02 |
Open |
Water Administration |
Standard |
Statewide Surface Water Diversion Standard: Administrative Protocol and Functional Standards - Surface Water Headgates and Measuring Devices |
2013-11-04 |
Open |
Water Administration |
Standard |
Water Rights Tabulation Standard |
2024-10-11 |
Open |
Water Administration |
Written Instruction and Order |
WRITTEN INSTRUCTION 2015-02: CONCERNING THE ADMINISTRATION OF DIVERSIONS OF WATER DURING FREE RIVER |
2015-11-04 |
Open |
Water Administration |
Written Instruction and Order |
WRITTEN INSTRUCTION 2015-03 (Amended): CONCERNING THE ADMINISTRATION OF DIVERSIONS OF WATER DURING A FUTILE CALL DETERMINATION |
2023-01-12 |
Open |
Water Administration |
Written Instruction and Order |
WRITTEN INSTRUCTION 2016-01: CONCERNING THE INSTRUCTION FOR IMPLEMENTATION OF ST. JUDE'S RULING INTO DWR'S ADMINISTRATIVE AND CONSULTATION DUTIES |
2017-07-13 |
Open |
Water Administration |
Written Instruction and Order |
WRITTEN INSTRUCTION AND ORDER 2007-01: CONCERNING THE ADMINISTRATION OF SUBORDINATION AGREEMENTS |
2007-05-31 |
Open |
Water Administration |
Written Instruction and Order |
WRITTEN INSTRUCTION AND ORDER 2007-02: CONCERNING THE ADMINISTRATION OF STORAGE RIGHTS BY SENIORS FIRST |
2007-05-31 |
Open |
Water Administration |
Written Instruction and Order |
WRITTEN INSTRUCTION AND ORDER 2007-03: CONCERNING THE ADMINISTRATION OF POWER INTERFERENCE CONTRACTS |
2007-05-31 |
Open |
Water Administration |
Written Instruction and Order |
WRITTEN INSTRUCTION AND ORDER 2015-01: CONCERNING THE ADMINISTRATION OF WATER RIGHTS DECREED FOR IRRIGATION |
2015-03-25 |
Open |
Water Rights |
Guideline |
General Administration Guidelines for Reservoirs |
2016-02-01 |
Open |
Water Rights |
Guideline |
Guideline 2019-3 Reservoir Accounting |
2019-11-22 |
Open |
Water Rights |
Guideline |
GUIDELINE 2021-1 PROCEDURE FOR THE STATE ENGINEER TO CONFIRM THE EXTENT OF CLAIMED UNADJUDICATED USES OR EXCHANGES OF WATER BEING MADE ON THE DATE OF APPROPRIATION OF AN INSTREAM FLOW WATER RIGHT |
2021-09-15 |
Open |
Water Rights |
Policy |
Policy 2000-1: Pending Water Right Applications on Federal Lands |
2000-03-07 |
Open |
Water Rights |
Policy |
REVOKED 5/31/2007 - Policy 1999-2 (SEE WRITTEN INSTRUCTION AND ORDER 2007-03): Administration of Power Interference Contracts |
1999-03-01 |
Open |
Water Rights |
Protocol |
REVOKED - Division 7 - Animas La Plata Administrative Protocol |
2018-09-07 |
Open |
Water Rights |
Standard |
Water Rights Tabulation Standard |
2024-10-11 |
Open |
Water Rights |
Written Instruction and Order |
WRITTEN INSTRUCTION 2015-03 (Amended): CONCERNING THE ADMINISTRATION OF DIVERSIONS OF WATER DURING A FUTILE CALL DETERMINATION |
2023-01-12 |
Open |
Water Rights |
Written Instruction and Order |
Written Instruction 2020-1: Out of Priority Water Rights Absolute |
2020-07-21 |
Open |
Well Permitting |
Guideline |
Guideline 2003-4 Concerning the Retention of Applications that are Withdrawn by the Applicant or for which Additional Information was Requested in order to Process the Application |
2024-04-29 |
Open |
Well Permitting |
Guideline |
Guideline 2003-5 Regarding the Use of Wells Within Water Service Areas |
2003-09-16 |
Open |
Well Permitting |
Guideline |
Guideline 2004-1 Differentiate between Well Repair and Well Replacement |
2004-02-19 |
Open |
Well Permitting |
Guideline |
Guideline 2005-1 Determining the validity of non-exempt permits |
2005-03-08 |
Open |
Well Permitting |
Guideline |
Guideline 2006-2 Concerning the State Engineer's Application of Rule 11.A of the Statewide Nontributary Ground Water Rules |
2006-08-10 |
Open |
Well Permitting |
Guideline |
Guideline 2009-1 Concerning the State Engineer's Permitting Authority over Wells Located on Hazardous Waste Remediation Sites |
2024-04-29 |
Open |
Well Permitting |
Guideline |
Guideline 2012-1 Concerning Permitting and Operation of Headgate Wells |
2012-02-01 |
Open |
Well Permitting |
Guideline |
Guideline 2016-1 Concerning Water Supplies for Auxiliary Living Spaces |
2023-12-20 |
Open |
Well Permitting |
Guideline |
Guideline 2017-1 Evaluating Applications for Permits to use an Existing Well, Requests to Reinstate Expired Permits, and Acceptable |
2017-08-31 |
Open |
Well Permitting |
Guideline |
Guideline 2023-1 Concerning uses of water from exempt and small capacity wells |
2023-12-20 |
Open |
Well Permitting |
Policy |
Policy 1985-1 Concerning the Evaluation of Well Permit Applications for Exempt Commercial Uses |
2023-09-19 |
Open |
Well Permitting |
Policy |
Policy 1986 Concerning the moving of Registered and/or Decreed Wells of the type described in CRS 37-92-602(1)(b)&(e) and which are No Longer Needed at their Original Location |
1986-07-23 |
Open |
Well Permitting |
Policy |
Policy 1986 Concerning Wells Considered Pursuant to C.R.S. 37-92-602 (Exempt) in the Denver Basin Aquifers |
1986-04-23 |
Open |
Well Permitting |
Policy |
Policy 1987 Reconstruction of a Well prior to the Expiration Date on the Well Permit |
1987-06-29 |
Open |
Well Permitting |
Policy |
Policy 1990-1: Recording and permitting of wells for exempt commercial uses initiated prior to May 8, 1972 |
2023-12-11 |
Open |
Well Permitting |
Policy |
Policy 1991-1 Permitting of wells, pursuant to Subsection 37-92-602(3)(b)(II)(A),C.R.S. on tracts of 35 acres or more, where such tracts are divided by right-of-way or necessity |
2023-03-02 |
Open |
Well Permitting |
Policy |
Policy 1993-1 Concerning the Amendment or correction of well locations |
2023-08-21 |
Open |
Well Permitting |
Policy |
Policy 1993-2 Registering Feedlot and Dairy Operation Wells |
1994-02-03 |
Open |
Well Permitting |
Policy |
Policy 1993-4 Use Restrictions for Permits Issued as the Only Well on 35+ Acres |
2023-02-09 |
Open |
Well Permitting |
Policy |
Policy 1994-5 Remediation Project Recovery Wells |
1994-11-08 |
Open |
Well Permitting |
Policy |
Policy 1995-4 Late Recording of Exempt Wells pursuant to 37-92-602(5) |
2011-01-14 |
Open |
Well Permitting |
Policy |
Policy 2008-2 Geothermal Rule 8.3.3 |
2008-11-28 |
Open |
Well Permitting |
Policy |
Policy 2010-3 Geothermal Rule 8.3.3 |
2010-05-19 |
Open |
Well Permitting |
Policy |
Policy 2010-4 Concerning applications to the State Engineer to make determinations of nontributary ground water |
2014-06-13 |
Open |
Well Permitting |
Policy |
Policy 2011-1 Concerning the Evaluation of New Divisions of Land by Subdivision, Subdivision Exemption, and Cluster Development when Considering Proposals for Water Supply from Proposed Wells or Existing Wells |
2021-03-24 |
Open |
Well Permitting |
Policy |
Policy 2011-2 Exception to 600-Foot Spacing for Non-Exempt Wells |
2012-01-20 |
Open |
Well Permitting |
Policy |
Policy 2011-4 (Amended) Acceptance of Electronic and Facsimile Applications and Forms |
2020-02-07 |
Open |
Well Permitting |
Policy |
Policy 2014-01 Concerning the Division of Water Resources' Response to Complaints Regarding Water Use |
2019-03-01 |