Subject Search (filter keywords in subject field)
Topic Document Type Subject Document Date
Open Arkansas River Basin Policy Division 2 - Arkansas River Basin: Measurement Rule Variance Policies - Cover Letter, Rule List 2008-04-11
Open Arkansas River Basin Policy Measurement Rule Policy 2008-03.0A: Allowable Variance to Amended Measurement Rule 3 for Hour Meters 2008-04-01
Open Arkansas River Basin Policy Measurement Rule Policy 2008-03.0B: Allowable Variance to Amended Measurement Rule 3 for Privately-Owned Electric Meters (Aka Slave Meter) 2008-04-01
Open Arkansas River Basin Policy Measurement Rule Policy 2008-03.1A: Clarifications to Amended Measurement Rule 3.1: Totalizing Flow Meters 2008-04-01
Open Arkansas River Basin Policy Measurement Rule Policy 2008-03.1C: Clarification and Variance to Amended Measurement Rule 3.1: Totalizing Flow Meter Testing Frequency 2008-04-01
Open Arkansas River Basin Policy Measurement Rule Policy 2008-03.2A: Allowable Variance to Amended Measurement Rule 3.2: System Stabilization 2008-04-01
Open Arkansas River Basin Policy Measurement Rule Policy 2008-03.2B: Allowable Variance to Amended Measurement Rule 3.2: PCC Re_Rating Frequency 2008-04-01
Open Arkansas River Basin Policy Measurement Rule Policy 2010-3.1B: Clarification and Variance to Amended Measurement Rule 3.1: Totalizing Flow Meter Correction Factors (Field Calibration) 2011-09-01
Open Arkansas River Basin Policy Measurement Rule Policy 2011-3.1A: Allowable Variance for Coal Bed Methane Wells to Amended Measurement Rule 3.1: Totalizing Flow Meter Correction Factors (Field Calibration) 2010-05-01
Open Arkansas River Basin Standard Well Measurement Program Standard 2019-10-01